I have quite a to do list to get through in the next few days. I did get a great batch of photos (finally!) this afternoon.
When I was going through my stash the other day,* I was able to empty out one of the smaller storage bins. I have a matching set of three and two of them are full of FOs for the store, now all three can be used for FOs. I have crazy, elaborate plans for the stash. A slow, but hopefully more productive way of inventorying it on Ravelry. But that is not on the list until March!
Part of the list for this month is updating photos and getting FOs listed. As I was organizing the dishcloths today for photos, I realized there were at least half a dozen colors that I have NEVER listed. Oop. Who knows when I knit all of these things, dishcloths are quickie projects and I tend to make a ton all at once. I can also knit them without looking most of the time, so they were popular study-knit projects.
*I finally found my tripod! I've been looking for it for weeks!
Showing posts with label to do. Show all posts
Showing posts with label to do. Show all posts
Thursday, February 07, 2013
Wednesday, December 19, 2007
Late nights.
I just noticed that it's 3 am. Oops. I should stop playing with yarn and the internet and go to bed.
Quickie update:
2 ballbands done!
2 diagonal stripe dishcloths done!
2 scarves done!
Woot!
I just cast on for a hat and will probably get started on the matching mittens tomorrow. I have a few other hats I want to knit but those can wait until after Christmas (they're being mailed places) and I want to make a few more dishcloths. And that log cabin... I almost forgot. It's growing. I need to spend some quality time with it tomorrow. I'm sure I'll need a break from insane cabled hat knitting.
Quickie update:
2 ballbands done!
2 diagonal stripe dishcloths done!
2 scarves done!
Woot!
I just cast on for a hat and will probably get started on the matching mittens tomorrow. I have a few other hats I want to knit but those can wait until after Christmas (they're being mailed places) and I want to make a few more dishcloths. And that log cabin... I almost forgot. It's growing. I need to spend some quality time with it tomorrow. I'm sure I'll need a break from insane cabled hat knitting.
Monday, December 17, 2007
It's the final countdown!!
Two scarves down. One ballband down. One halfway done. Log Cabin almost done.
Now I just need to knit some hats and a few more ballbands. Not too shabby. I'm going to be up weird hours this week because Vince has a million papers to write and I'm trying to offer moral support by staying awake with him. Which might actually be distracting him more... Anyway, I'm going to go knit a few rows on a ballband.
Now I just need to knit some hats and a few more ballbands. Not too shabby. I'm going to be up weird hours this week because Vince has a million papers to write and I'm trying to offer moral support by staying awake with him. Which might actually be distracting him more... Anyway, I'm going to go knit a few rows on a ballband.
Monday, January 29, 2007
Things I do when I should be doing other things.
I'm being trained for a new job at work. I'm excited about the new position but unfortunatley, the training has been interrupted by an audit. I've spent days digging through months of paperwork. Making copies of paperwork. Ripping staples out of paperwork. Stapling paperwork back together. Breaking my stapler... You know, the usual. During one of my long periods of boredom I started making lists in my head. Eventually the lists in my head made it to paper.
Today's list involved things I want knit or finish knitting.
In translation since my handwriting is all scribbled:
Queue
- 2 ballband handtowels for Mom
- hat for Zay
- robe for Zay (find yarn/adapt pattern)
- mittens
- beret from IK (red Cashmerino Astrakhan)
- zombies/robots
- felted boxes
- ballband for Aimee
- ballbands for me (! how do I not have a single one for myself?!)
- noro hat for me
- hourglass sweater (swatch!!!)
Finish
- log cabin
- IHS
- rag rug (find and finish)
- red blanket
Frog
- socks
Today's list involved things I want knit or finish knitting.
In translation since my handwriting is all scribbled:
Queue
- 2 ballband handtowels for Mom
- hat for Zay
- robe for Zay (find yarn/adapt pattern)
- mittens
- beret from IK (red Cashmerino Astrakhan)
- zombies/robots
- felted boxes
- ballband for Aimee
- ballbands for me (! how do I not have a single one for myself?!)
- noro hat for me
- hourglass sweater (swatch!!!)
Finish
- log cabin
- IHS
- rag rug (find and finish)
- red blanket
Frog
- socks
Subscribe to:
Posts (Atom)